2022-12-22
It was learned on December 19 that Daqing Drilling team 30681 and 15160 drilling team both broke the 100,000 meter mark. These are the "four consecutive titles" and "two consecutive titles" of the two teams with the penetration exceeding 100,000 meters, which shows the responsibility and responsibil
2022-10-27
According to foreign media news: local time on October 24, Azerbaijani President Ilham Aliyev said that Azerbaijan plans to resume the Baku-Supsa oil pipeline operation.Aliyev said the resumption of the pipeline could bring Caspian oil from the Sangachal terminal near Baku to the Georgian port of Su
TEL: +86-022-63962564