Article List
- 100 Days: Tarim Oilfield set a new record for the shortest oil and gas production time of 10 million tonsAs of April 10, Tarim Oilfield has produced 2.146 million tons of crude oil and 9.91 billion cubic meters of natural gas this year, and achieved 10.04 million tons of oil and gas equivalent in 100 days, setting a new record for the shortest oil and gas production time of 10 million tons. Since the b
- The third batch of orders from Southeast Asia customer were deliveredLast week, the third batch of the two-year oil production equipment order from the Southeast Asian customer has been completed after 30 days of production.The order includes RWAC sucker rod pump, D-class sucker rods, pony rods, roller sucker rod centralizers, polished rods, stuffing box, wellhead BO
- Double Packed Stuffing Box1. The stuffing box is installed on the wellhead to seal polished rod to prevent crude oil spill well. 2.1. Chemical CompositionThe chemical composition of stuffing boxes shall be any composition of AISI recommended series materials listed below which meet the mechanical property requirements. The c
- Iranian Oil Terminal Company accelerates development of new projectsThe Tehran Times reported on April 11 that the Iranian Oil Terminal Company said it was accelerating the development of oil projects to boost exports of oil and natural gas condensate. Kahag Island is a continental island in the Persian Gulf in southern Iran, 25 kilometers off the coast of Iran and
- Asia's largest onshore oil production platform has been put into production in Jilin OilfieldRecently, Asia's largest land oil production platform
- Our company website is back to normal useDear customers and friends our website cannot be opened recently due to geopolitical conflicts. We are deeply sorry for the impact caused by the failure of the website to be opened normally. At present, after our active coordination and efforts, our website can be opened, customers and friends can
- The Goods Ordered By Our Customer Shipped SmoothlyAlthough affected by the prevention and control of the SARI in China, the production of our company's products is temporarily unavailable. As the government has maintained the operation of some domestic logistics companies, our company’s products in stock can still meet the needs of some customers.
- Products Ordered By Customers Shipped One After AnotherWith the effective control of the SARI by our Chinese government, the impact of the SARI is gradually weakening, and China's economic production and social life order is gradually recovering. Our company's products not previously shipped can already be delivered to customers one after another. This
- Full Recovery Of Product ProductionWith the effective control of the new type virus (SARI) in China, our company's production workshop has fully resumed production this week. Although the production capacity has not been fully restored due to the limitation of the number of production personnel, our customers' order has already been
- Stuffing Boxes Complete Assembly And Will Be Delivered This WeekDue to the impact of the SARI, the stuffing boxes ordered by our Central Asian customer had been unable to arrange production before. Since the production workshop resumed last week, our company has arranged personnel to hurry to produce the products of this order . Completed mechanical processing,